Bridge Refurbishment Leicester
Protective coatings applied to steel frame once the correct surface preparation has been completed.
Bridge Refurbishment Leicester
ISO 9001 & 14001 Accredited company
DELIVERING QUALITY THROUGHOUT THE UK
Industry Sectors
Highways
Decorating
Railway
Defence
Marine
Energy
Construction
Welcome to
Complete Blasting Services
Professionals in Specialist on-site Blast cleaning & coating applications throughout the UK.
Our main service includes Mobile Sandblasting & Shotblasting, on site coating applications including Intumescent Fire protective coatings to any specification, water jetting and building cleaning of all requirements.
We can remove many types of coatings from a wide range of surfaces.
Every project we undertake is carried out in only a highly professional manner,
We can offer professional advice with our extensive knowledge to ensure work is completed correctly and cost-effective.
We are fully insured, and safety accredited taking the environment and public into high consideration.
Please take a look at the specialist services we provide and don’t hesitate to contact with any potential projects we could help with.
Recent Projects
Hale Factory Refurbishment:
Take a look at this project we have completed in Hale Manchester,
We were called in to shotblast all the steel frame units back to SA2.5 standard then prime ready for the Intumescent coatings to be applied.
Our team of blasters and sprayers have put some really hard work into completing this project on time so the clients can keep on schedule to re clad the units.
we delivered the full package from blast, paint and tidy up.
See the full job description in our case studies page.
MANCHESTER - NEPTUNE MILL:
Check out this old mill located in Manchester we had the privilege to work on,
Our team were called in to remove the layered up paintwork off the whole internal brick surfaces including the structural steel and timber Ceilings.
This project had a deadline of 6 weeks of which we put x3 blast rig's working full time to complete the works on schedule,
We also had the responsibility of cleaning the whole internal building removing almost 80 tones of waste.
See the full job description in our case studies page.
Leicester Bridge Refurbishment:
Take a look at this bridge we have recently completed in Leicester.
Our job was to remove the lead basted paint and corrosion so the bridge could be inspected then the whole underside and sides could be re coated
We had to put a lot of caution and planning into this project with working above water with a specially designed scaffold and air tight wrap around the bridge this was to contain all the waste materials from going into the water combined with an extraction system for air flow and dust reduction.
Our team managed to complete the works on schedule with no delay so other trades could stick to the programmed deadline.
See the full job description in our case studies page.
Contact CBS
Don't hesitate to get in touch! We welcome all enquiries and questions relating to previous job profiles or projects we could help you Complete.