Case Study Kwik Fit

In September 2017 we starter a contract with Kwik-Fit who required our surface preparation service.

There are an estimated 100 depos which have slippery coatings to the front of the entrance bays that need removing.

Using specialist equipment, we removed unwanted coatings with machinery used under high power.

The works are carried out of hours throughout the UK.

Once the paint had been removed it was left as a finished profile leaving an anti slip entrance,

Our work is still ongoing.