Holbeck Bridge Leeds.
We have recently completed this old 1849 iron bridge in leeds, called in by BAM they needed us to carry out the shotblasting and paint priming works to be able to carry out testing and repair works if needed.
This project had its challenges as it was working over water with regular water levels changing close to the underside scaffolding platform.
Meaning our time scale was crucial to work long days to achieve a blasted clean finish, primed and cleaned out spotless incase the water levels increased risking taking and abrasive and waste into the river, our team had to be on constant cleaning duties to ensure this didn't happen.
Take a look at the fantastic results we achieved!